Search results

Results 1 – 20 of 848
Advanced search

Search in namespaces:

There is a page named "TTC Line 2" on Wikipedia

View (previous 20 | ) (20 | 50 | 100 | 250 | 500)
  • Thumbnail for Line 2 Bloor–Danforth
    Line 2 Bloor–Danforth is a subway line in the Toronto subway system, operated by the Toronto Transit Commission (TTC). It has 31 stations and is 26.2...
    100 KB (9,797 words) - 15:30, 2 July 2024
  • Thumbnail for Line 4 Sheppard
    Line 4 Sheppard is the newest and shortest subway line of the Toronto subway system, operated by the Toronto Transit Commission (TTC). It opened on November...
    54 KB (5,409 words) - 01:12, 4 July 2024
  • Thumbnail for Line 3 Scarborough
    The TTC planned for Line 3 to cease operations in November 2023, with shuttle buses running in place of Line 3 train service until the Line 2 Bloor–Danforth...
    77 KB (7,280 words) - 01:01, 1 July 2024
  • Thumbnail for Line 1 Yonge–University
    The TTC rejected this proposal saying there was insufficient population to justify such a project. In 1942, the TTC proposed a north–south line under...
    117 KB (11,417 words) - 15:04, 1 July 2024
  • Thumbnail for Toronto subway
    Toronto subway (redirect from TTC subway/RT)
    and one subway line (running both underground and on elevated guideways). In 1954, the TTC opened Canada's first underground rail line, then known as...
    132 KB (12,853 words) - 14:55, 7 July 2024
  • Thumbnail for Line 5 Eglinton
    Commission (TTC), the line will be part of the Toronto subway system as its fifth route. The first phase of the 19-kilometre (12 mi) line will include...
    175 KB (15,498 words) - 21:27, 9 July 2024
  • Thumbnail for List of Toronto subway stations
    operated by the Toronto Transit Commission (TTC). It was the country's first subway system: the first line was built under Yonge Street with a short stretch...
    38 KB (940 words) - 19:04, 28 June 2024
  • Thumbnail for Line 6 Finch West
    Toronto. Line 6 was originally expected to open within the first half of 2024, with an estimated cost of CA$2.5 billion. For budget purposes, the TTC made...
    74 KB (5,942 words) - 01:03, 8 July 2024
  • Thumbnail for Toronto Transit Commission
    provided the bulk of the service. In 1954, the TTC adopted its present name, opened the first subway line, and greatly expanded its service area to cover...
    95 KB (9,383 words) - 00:31, 9 July 2024
  • Thumbnail for Toronto streetcar system
    in Toronto, Ontario, Canada, operated by the Toronto Transit Commission (TTC). It is the third busiest light-rail system in North America. The network...
    118 KB (9,973 words) - 01:13, 4 July 2024
  • Thumbnail for Bloor–Yonge station
    and 2 Bloor Street West. Since April 2019, the TTC has been proposing a major upgrade to Bloor–Yonge station, including adding a second Line 2 platform...
    20 KB (1,685 words) - 01:24, 27 June 2024
  • Thumbnail for 510 Spadina
    service on the line was suspended and replaced by buses. This was to allow major track work to be completed in preparation for the TTC's new low-floor...
    16 KB (1,308 words) - 22:11, 10 March 2024
  • Thumbnail for Union station (TTC)
    2021. Retrieved May 17, 2015. "TTC marks milestone of revitalized Union Station". Toronto Transit Commission. July 2, 2015. Archived from the original...
    23 KB (1,938 words) - 21:34, 22 April 2024
  • Thumbnail for Toronto Transit Commission bus system
    The Toronto Transit Commission (TTC) uses buses and other vehicles for public transportation. In 2018, the TTC bus system had 159 bus routes carrying over...
    84 KB (7,865 words) - 00:56, 7 July 2024
  • built instead of the Relief Line. Thus, in June 2019, TTC and City staff suspended further planning work on the Relief Line. In October 2019, Toronto City...
    39 KB (3,874 words) - 00:42, 23 June 2024
  • Thumbnail for Scarborough Centre station
    Toronto Transit Commission (TTC) and one Durham Regional Transit (DRT) bus route. It was also a rapid transit station serving Line 3 Scarborough of the Toronto...
    19 KB (1,386 words) - 19:45, 28 June 2024
  • Thumbnail for 501 Queen
    501 Queen (redirect from 301 Queen (TTC))
    (just west of Browns Line, adjacent to Long Branch GO Station), replacing route 507 Long Branch. This route operates as part of the TTC's Blue Night Network...
    43 KB (4,090 words) - 05:28, 7 July 2024
  • Thumbnail for Toronto subway rolling stock
    Line 1 Yonge–University, Line 2 Bloor–Danforth, and Line 4 Sheppard. The rolling stock is owned and maintained by the Toronto Transit Commission (TTC)...
    30 KB (767 words) - 13:54, 17 June 2024
  • Thumbnail for 504 King
    its use of the low-floor Flexity Outlook streetcars. From December 2, 2017, the TTC assigned a minimum of two low-floor accessible Flexity Outlook streetcars...
    26 KB (2,264 words) - 22:10, 10 March 2024
  • Thumbnail for Metropolitan line (Toronto)
    the TTC took over the operation of the Metropolitan Line to Sutton, and renamed it the Lake Simcoe line. In 1930, the TTC closed the Metropolitan Line but...
    38 KB (4,077 words) - 16:08, 1 July 2024
View (previous 20 | ) (20 | 50 | 100 | 250 | 500)