Kampung Batu station

Coordinates: 3°12′17″N 101°40′32″E / 3.20472°N 101.67556°E / 3.20472; 101.67556
Source: Wikipedia, the free encyclopedia.
 KC03   PY13  Kampung Batu
KTM_Logo KTM_Komuter_Logo Rapid_KL_Logo
Commuter rail and MRT station
General information
Other names甘榜峇都站 (Chinese)
கம்போங் பத்து (Tamil)
LocationKampung Batu, Batu, Kuala Lumpur
Malaysia
Coordinates3°12′16.8″N 101°40′32.2″E / 3.204667°N 101.675611°E / 3.204667; 101.675611
Owned byKeretapi Tanah Melayu (KTM)
MRT Corp (MRT)
Operated byKeretapi Tanah Melayu (KTM)
Rapid Rail (MRT)
Line(s)West Coast Line
Tracks2 (KTM)
2 (MRT)
Construction
ParkingAvailable (Park & Ride facilities)
Bicycle facilitiesAvailable
AccessibleYes Disabled access
Other information
Station code KC03   PY13 
History
OpenedJuly 2010; 14 years ago (2010-07)
 KC03 
16 June 2022; 2 years ago (2022-06-16)
 PY13 
Services
Preceding station Keretapi Tanah Melayu
(Komuter)
Following station
Taman Wahyu
towards Batu Caves
Batu Caves–Pulau Sebang Line Batu Kentonmen
Preceding station Following station
Sri Delima Putrajaya Line Kentonmen

The Kampung Batu station is a Malaysian commuter and Rapid transit train station located in the west side of and named after the village of Kampung Batu (Batu Village) in northern Kuala Lumpur, Malaysia. It was built on the location of the disused colonial-era Batu Village railway station. The station is served by the KTM Komuter Seremban Line and the Putrajaya Line.

Location and locality

The station is located near Permai Ria condominium complex, which is part of Batu Permai housing area. The station is accessible to Jalan Sultan Azlan Shah (formerly known as Jalan Ipoh).

This station serves mainly the residents of Batu Permai, Pekan Batu, Kampung Batu Muda, PPR Batu Muda, Ampat Tin military family quarters and Taman Koperasi Polis housing area. The station is also accessible to Batu Caves and Sentul with bus services available.

Taman Metropolitan Batu, a local lake park is also situated nearby.

KTM Komuter

History

The station was constructed between the Batu Caves and the Sentul railway stations as part of a single-track, unelectrified line. It fell into disuse as with the rest of the portion of the railway line from Sentul to Batu Caves. During the Sentul Raya masterplan by YTL Corporation Berhad, the Kampung Batu station was demolished, and rebuilt for the KTM Komuter Port Klang-Sentul line extension.

Upon completion in July 2010, the station was served by the Port Klang Line which ran from Port Klang to Batu Caves. In December 2015, following a change in the services of the KTM Komuter, the portion of the railway line between Sentul and Batu Caves stations including Kampung Batu station was transferred to the Seremban Line, with trains now running between Pulau Sebang/Tampin and Batu Caves stations.

MRT Putrajaya Line

History

A station serving the Putrajaya line was constructed next to the existing KTM Komuter station. Under Phase One operations of the line, this station is temporarily the last station on the line, pending completion of the Kampung Batu-Putrajaya stretch.

The Kampung Batu MRT station commenced operations on 16 June 2022 at 3pm.

Feeder buses

Route 173
Route 173

Go KL City Bus MAROON  (to Sentul LRT station) and Rapid KL T120  (Jalan Kampung Batu exit) and173  serve here.

3°12′17″N 101°40′32″E / 3.20472°N 101.67556°E / 3.20472; 101.67556