Siegel Center
The Stu
Map
Location1200 West Broad Street
Richmond, Virginia, 23284, USA
Coordinates37°33′11″N 77°27′10″W / 37.552918°N 77.4529°W / 37.552918; -77.4529
OwnerVirginia Commonwealth University
OperatorVirginia Commonwealth University
Capacity7,637
SurfaceHardwood
Construction
Broke groundApril 23, 1996[1]
OpenedMay 1, 1999
Construction cost$30.1 million
($52.9 million in 2022 dollars[2])
ArchitectMarcellus Wright Cox & Smith
Structural engineerDunbar Milby Williams Pittman & Vaughan
General contractorPoole & Kent
Tenants
VCU Rams (NCAA) (1999–present)
Richmond Rhythm (IBL) (1999–2001)
A wide angle photograph of the Siegel Center with a sold out crowd during a "White Out" game against the Richmond Spiders.
The Siegel Center in 2024, sold out against the Richmond Spiders
Interior look at the Siegel Center during a men's basketball white out.
Final Four display on the concourse of the Siegel Center, commemorating VCU's 2011 NCAA Tournament run.

The Stuart C. Siegel Center is a 190,000-square-foot (18,000 m2) multi-purpose facility on the campus of Virginia Commonwealth University in Richmond, Virginia, United States. The facility's main component is the 7,637-(expandable to 8,000) seat E.J. Wade Arena. It also served as a student recreational area until 2010, when the new Cary Street Gym complex was completed. It now is used purely for VCU athletics and includes a weight room, auxiliary basketball court, and a cafè. The E.J. Wade Arena hosts Division I level NCAA inter-collegiate athletics and serves as a general-purpose assembly space for special events such as graduations, concerts, receptions, and a variety of competitions (both athletic and non athletic). It is named after Richmond businessman Stuart C. Siegel.

The complex opened in 1999 and cost $30.1 million to construct. $7 million of the cost was donated by local businessman Stuart C. Siegel; the center bears his name as a result. Its main tenant is the VCU Rams men's basketball team, which enjoys one of the nation's best home court winning percentages since moving into the facility. The court has received the reputation as arguably the toughest place to play in the Atlantic 10 Conference. The VCU Rams men's basketball team currently holds the 11th-highest home court winning percentage in Division I basketball with a winning percentage of 85.79[3] The student section, dubbed the "Rowdy Rams" is extremely passionate. In 2012–2013, the Rowdy Rams received the Naismith Student Section of the Year Award, recognizing the best student section in college basketball. Since January 2011, every home game at the Siegel Center has been sold out and the streak currently stands at 134 (as of 3/8/19). The arena also routinely hosts local and state high school basketball tournaments, in addition to hosting the annual Virginia Regional (formerly VCU/NASA) FIRST Robotics Competition.[4]

Before the 2016-2017 basketball season, the arena was renamed the E.J. Wade Arena; a construction company owned by a local family in Mechanicsville, VA. The deal is for $2.75 million over ten years, but the Wade family has promised a total monetary donation of $4.05 million over those ten years.[5]

Expansion

Recent expansion

2011 Updates - West Club Suites

In 2011, a $3.4 million facelift to the Siegel Center saw offices renovated, with the addition of luxury suites, a 120-club seat balcony, and the Tommy J. West Club, a new lounge.[6]

2014 Updates - Center Hung Scoreboard

In 2014, the most major renovation since the Tommy J. West club was completed. Four corporate corner suites were installed in one end of the arena. A new Daktronics HD center-hung scoreboard was installed at center court, it features four 11.5' by 15.5' panels, and the lower ring is 2' high by 15.5' wide. The Tommy J. West club was also outfitted with a large HD ribbon board that measures 2.5' high by 136' wide. The old center-hung audio system was also replaced. Now, speakers are peppered throughout the arena's roof to further immense the audience in the action. The total cost of the renovation was $1.9 million.[7]

2016 Updates - Corner Suites

In 2016, the arena added four more corporate corner suites opposite the arena side that was completed in 2014. All four corners of the Siegel Center now have suites. There are four smaller ones which cost $45,000, and four larger ones which cost $60,000. Each suite requires a three-year commitment.[8]

2022-2023 Updates - Repainting and more Video Boards

The white and gray sidewalls were painted black for the 2022-23 season. In 2023, VCU replaced the baseline scoreboards and videoboards with new, larger video boards, and surrounded the entire interior of the seating bowl with a video board stripe. The Baseline scoreboards show a combination of advertisements, individual stats, and team stats, while the stripe shows predominantly sponsor ads, with game score and clock being located in the corners.

Future Expansion

Plans were at one time in the works to upgrade the Siegel Center's capacity to 10,000 seats with a total cost of $12 million.[9] However, while the Rams once held a sellout streak of 166 consecutive games and a waitlist for tickets of over 1,000, a combination of decrease in demand for tickets from the fanbase combined with the coronavirus pandemic brought the sellout streak to an end in 2021.

See also

References

  1. ^ White, Jeff (April 21, 1996). "VCU Center Proves Skeptics in Error; Siegel Groundbreaking Is Tuesday". Richmond Times-Dispatch.
  2. ^ 1634–1699: McCusker, J. J. (1997). How Much Is That in Real Money? A Historical Price Index for Use as a Deflator of Money Values in the Economy of the United States: Addenda et Corrigenda (PDF). American Antiquarian Society. 1700–1799: McCusker, J. J. (1992). How Much Is That in Real Money? A Historical Price Index for Use as a Deflator of Money Values in the Economy of the United States (PDF). American Antiquarian Society. 1800–present: Federal Reserve Bank of Minneapolis. "Consumer Price Index (estimate) 1800–". Retrieved February 29, 2024.
  3. ^ "Men's Division I Home Court Records | RPIRatings.com". www.rpiratings.com.
  4. ^ "Data". my.usfirst.org. Retrieved 2020-05-13.
  5. ^ "VCU, Wade family announce naming rights deal for Siegel Center". WTVR. September 29, 2016.
  6. ^ Lincoln, Matt (November 10, 2011). "VCU unveils new luxury area at Siegel Center". WTOL.com. Archived from the original on April 4, 2012. Retrieved May 1, 2022.
  7. ^ Mason, Kris (November 3, 2014). "Siegel center sports new amenities The Commonwealth Times". CommonwealthTimes.org. Retrieved May 1, 2022.
  8. ^ Pearrell, Tim (August 5, 2016). "VCU notes: Two more luxury suites being added to Siegel Center". Richmond Times-Dispatch. Retrieved May 1, 2022.
  9. ^ "Pic". oi39.tinypic.com. Retrieved 2020-05-13.